PROJECTS

BURNS BOG NPS 30 STRESS RELIEF

EMB Management provided the project management, engineering and construction inspection to FortisBC NPS 30 Stress Relief project in Burns Bog, Delta, BC. The project consisted of the removal and replacement of 60m of NPS 30 piping in the environmentally sensitive Burns Bog.

WHISTLER PIPELINE MAOP UPGRADE

EMB Management provided the engineering and quality assurance for construction of 4.1km of new  natural gas pipeline and the MAOP upgrade of 1.7km of existing pipeline. The upgrade required detailed engineering and field work to increase the MAOP from 460kPa (67psi) to 2,070kPa (300psi).

NORTH VANCOUVER NATURAL GAS UTILITY RELOCATIONS

Our integrated team included project management, engineering and quality assurance to complete relocation and upgrade of natural gas utility piping in North Vancouver. The project was driven by a third party construction project and required interaction and coordination with the third party project team throughout design and construction.

SPARWOOD ROAD AND RAIL TRENCHLESS CROSSING REPLACEMENT

Our engineering team completed the engineering management and construction oversight for the replacement of an NPS 8 natural gas pipeline across a provincial highway and railway near Sparwood, BC. The crossing replacement was completed trenchlessly without disruption to the highway or railway.

© 2019 by EMB Management Ltd.